TBD
TERM OF APPRENTICESHIP The term of the apprenticeship is 4-5 years with an OJL attainment of hours 8,000-10,000 hours, supplemented by the minimum required 784 hours of related instruction. RATIO OF APPRENTICES TO JOURNEYWORKERS The apprentice to journeyworker ratio is: 1 Apprentice(s) to 1 Joureyworker(s).
WORK PROCESS SCHEDULE Tool and Die Maker O*NET-SOC CODE: 51-4111.00 RAPIDS CODE: 0586HY Description: Analyze specifications, lay out metal stock, set up and operate machine tools, and fit and assemble parts to make and repair dies, cutting tools, jigs, fixtures, gauges, and machinists' hand tools. On-The-Job Training: Apprentices will receive training in the various work experiences listed below. The order in which this training is given will be determined by the flow of work on the job and will not necessarily be in the order listed. The times allotted to these various processes are the estimated times which the average apprentice will require to learn each phase of the trade. They are intended only as a guide to indicate the quality of the training being provided and the ability of the apprentice to absorb this training in an average amount of time.
The Human Resources Manager and the Department Manager will make the final selection based upon the occupational requirements and the need of the company.
This is based on Lakepark policy.